{"id":2754,"date":"2015-02-03T15:29:05","date_gmt":"2015-02-03T22:29:05","guid":{"rendered":"http:\/\/www.parkrag.com\/?p=2754"},"modified":"2015-02-03T15:29:05","modified_gmt":"2015-02-03T22:29:05","slug":"7-million-additional-capital-outlays-requested-school-administrators","status":"publish","type":"post","link":"https:\/\/v2.parkrag.com\/index.php\/2015\/02\/03\/7-million-additional-capital-outlays-requested-school-administrators\/","title":{"rendered":"The $7 Million in Additional Capital Outlays Requested by School Administrators"},"content":{"rendered":"<p>The Park City School Board is considering $57 million in capital outlay requests. Previously&nbsp;we listed the $50 million in requests that were each over a million dollars. Here are the remaining $7 million of requests that will be considered:<\/p>\n<style type=\"text\/css\">\n\ttable.tableizer-table {\n\tborder: 1px solid #CCC; font-family: Arial, Helvetica, sans-serif;\n\tfont-size: 12px;\n} \n.tableizer-table td {\n\tpadding: 4px;\n\tmargin: 3px;\n\tborder: 1px solid #ccc;\n}\n.tableizer-table th {\n\tbackground-color: #104E8B; \n\tcolor: #FFF;\n\tfont-weight: bold;\n}\n<\/style>\n<table class=\"tableizer-table\">\n<tr class=\"tableizer-firstrow\">\n<th>Location<\/th>\n<th>Project<\/th>\n<th> Amount Requested <\/th>\n<th>School Rationale\/Explanation\/Comments<\/th>\n<th>Person Requesting<\/th>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Update School Lunch Computer Program<\/td>\n<td> $66,000.00 <\/td>\n<td>Need to replace school lunch computors and programs<\/td>\n<td>Elizabeth Srasser<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Radon Gas testing in all Buildings<\/td>\n<td> $10,000.00 <\/td>\n<td>Testing is needed in all buildings<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Add Wood Chips to Play areas<\/td>\n<td> $15,000.00 <\/td>\n<td>Need wood chips added for fall protection<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Roof Repair<\/td>\n<td> $50,000.00 <\/td>\n<td>Needed roof repairs district wide<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Painting<\/td>\n<td> $40,000.00 <\/td>\n<td>Repair and Paint walls district wide<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Energy Conservation Upgrades<\/td>\n<td> $75,000.00 <\/td>\n<td>Change over to LED lights <\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Recycling upgrades<\/td>\n<td> $100,000.00 <\/td>\n<td>Add designated recycling areas to all schools<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Safety needs <\/td>\n<td> $100,000.00 <\/td>\n<td>Door safety barriers, finish hanging blinds and emergeny shut down for HVAC systems.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Asphalt and Slurry Coat \/Restriping<\/td>\n<td> $350,000.00 <\/td>\n<td>Parking lots are in bad shape <\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Tune Boilers in all schools<\/td>\n<td> $50,000.00 <\/td>\n<td>Tune and clean boiler tubes in all schools<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Yearly Inspections<\/td>\n<td> $35,000.00 <\/td>\n<td>Yearly Inspections Fire Sprinklers, Boilers, Elevators, Kitchen hoods, Grease traps.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Add (C.O.) Carbon Monoxide Alarm System to Existing Fire Alarm.<\/td>\n<td> $110,000.00 <\/td>\n<td>Update fire alarm system to include carbon monoxide to meet state law<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>PCHS, TMJH, EHMS<\/td>\n<td>Refinish Gym Floors<\/td>\n<td> $25,000.00 <\/td>\n<td>Done each year<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Add Weathertrak Sprinkler Clocks<\/td>\n<td> $200,000.00 <\/td>\n<td>Sprinkler clocks that will save water monitoring weather,  water line breaks and valve problems.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Contingency<\/td>\n<td> $500,000.00 <\/td>\n<td>&nbsp;<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Internet Filter<\/td>\n<td> $50,000.00 <\/td>\n<td>We need to look into our internet filter and see if it is adequate for our needs. Time to update<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Switch Updates<\/td>\n<td> $100,000.00 <\/td>\n<td>We have several network switches that need to be replaced with faster connections.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Update Firewall<\/td>\n<td> $120,000.00 <\/td>\n<td>Our inside firewall will be going out of maintenance this year and needs to be replaced<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Backup Storage Solution<\/td>\n<td> $50,000.00 <\/td>\n<td>Our old backup unit is in need of replacement.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Security<\/td>\n<td> $30,000.00 <\/td>\n<td>Setup one building with a classroom security system to let office and 911 know there is a problem.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Video Storage<\/td>\n<td> $15,000.00 <\/td>\n<td>Our server that holds the video surveillance along Kearns Blvd. needs to be updated.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>District wide<\/td>\n<td>Server Updates<\/td>\n<td> $30,000.00 <\/td>\n<td>We have several servers that need to be updated this year.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Update Hardware<\/td>\n<td> $60,000.00 <\/td>\n<td>AutoCAD system needs to be replaced<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Wireless Update<\/td>\n<td> $70,000.00 <\/td>\n<td>Update the High School Network to the Latest Wireless Standards<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>School News Digital Feed<\/td>\n<td> $15,000.00 <\/td>\n<td>Needs to update the way the school news is captured so other buildings can view it.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Concrete Bleachers for Baseball and Softball fields.<\/td>\n<td> $40,000.00 <\/td>\n<td>Currently Baseball and Softball fields do not have any bleachers fans need to bring there own chairs or sit on the wet grass.<\/td>\n<td>Jamie Sheetz<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Replace Basement Windows in Home Economics Departments<\/td>\n<td> $15,000.00 <\/td>\n<td>Basement Windows have been exposed to landscaping sprinklers and have been a leaking problem for several years.<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Add 4 Pole Lights along sidewalk On North West Side of School.<\/td>\n<td> $10,000.00 <\/td>\n<td>It is very dark in the mornings and dangerous for the students.<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Salter for Komatsu Skid Steer tractor<\/td>\n<td> $5,000.00 <\/td>\n<td>Salter for skid steer will save time<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Need New Floor Installed in the Freezer<\/td>\n<td> $10,000.00 <\/td>\n<td>Freezer floor is starting to buckel and is a safety hazard<\/td>\n<td>Colby Pearce Elizabeth Strasser<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Exhaust Fans for Science Labs<\/td>\n<td> $20,000.00 <\/td>\n<td>Need exhaust fan system to rid labs of potentially harmful fumes to students and staff<\/td>\n<td>Bob O&#8217;Connor<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Dozier Field Perimeter Sidewalk and Fence<\/td>\n<td> $100,000.00 <\/td>\n<td>Safety concerns with event and crowd management during Dozier Field activities, no barriers to separate participants from fans and bystanders.<\/td>\n<td>Jamie Sheetz<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Concert Wind &#038; Percussion Instruments<\/td>\n<td> $385,000.00 <\/td>\n<td>Current inventory is out of date. Amount is variable.<\/td>\n<td>Bret Hughes<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Theme Renovation<\/td>\n<td> $25,000.00 <\/td>\n<td>HS building quotes are misquoted, poorly punctuated, and attributed to the wrong author. Replace with student artwork, classic artwork or local art.<\/td>\n<td>Bob O&#8217;Connor<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Marching Band Uniforms<\/td>\n<td> $32,000.00 <\/td>\n<td>Additional unifirms needed to accommodate growth of the program. Approx $400 per unit.<\/td>\n<td>Bret Hughes<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Greenhouse<\/td>\n<td> $15,000.00 <\/td>\n<td>Addition to small green house to support high-level science and environmental scienve classes and clubs.<\/td>\n<td>Bob O&#8217;Connor<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>New Gym Floor<\/td>\n<td> $120,000.00 <\/td>\n<td>Gym floor is warped and does not meet DIN 2001 standard increasing the likelyhood of injury to athletic teams and PE students.<\/td>\n<td>Jamie Sheetz<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>New Flagpole at Dozier Field<\/td>\n<td> $10,000.00 <\/td>\n<td>Current Flagpole is in poor condition and is not appropriate in size for venue and is not illuminated.<\/td>\n<td>Jamie Sheetz<\/td>\n<\/tr>\n<tr>\n<td>PCHS<\/td>\n<td>Dozier Field South End Zone Area<\/td>\n<td> $150,000.00 <\/td>\n<td>Condition of grass and long jump area make it hazardous for foot traffic and general use. Need to match existing turf.<\/td>\n<td>Jamie Sheetz<\/td>\n<\/tr>\n<tr>\n<td>Eccles<\/td>\n<td>Install Snow Guards on Metal Roof<\/td>\n<td> $50,000.00 <\/td>\n<td>It is a Safety hazard and needs to be done.<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>Eccles<\/td>\n<td>Robert Juliat Incandesant Follow Spots<\/td>\n<td> $30,000.00 <\/td>\n<td>Will replace the failing spots which are original to the space<\/td>\n<td>Dave Hallock<\/td>\n<\/tr>\n<tr>\n<td>Eccles<\/td>\n<td>HDCP Compliant Projector<\/td>\n<td> $65,000.00 <\/td>\n<td>Will allow the showing of films which have been encrypted<\/td>\n<td>Dave Hallock<\/td>\n<\/tr>\n<tr>\n<td>TMJHS<\/td>\n<td>Level the Floors in Classrooms 8, 35 and 39<\/td>\n<td> $300,000.00 <\/td>\n<td>These rooms are not conductive to great teaching we no longer have computer labs and we need flat nonstepped classrooms.<\/td>\n<td>Dave McNaughtan<\/td>\n<\/tr>\n<tr>\n<td>TMJHS<\/td>\n<td>Connect the Two Hallways heading South<\/td>\n<td> $500,000.00 <\/td>\n<td>Reduce congestion allowing students to get to class in a safer more orderly fashion.<\/td>\n<td>Dave McNaughtan<\/td>\n<\/tr>\n<tr>\n<td>TMJHS<\/td>\n<td>Lecture Hall Attached to the new Hallway<\/td>\n<td> $650,000.00 <\/td>\n<td>Need a place for the whole staff to meet and a place where we can put multiple classes at the same time.<\/td>\n<td>Dave McNaughtan<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Storage Cabinets for sports Gear<\/td>\n<td> $25,000.00 <\/td>\n<td>We have no storage for student spot bags and gear.This creates a safety hazard in our common area and halls.<\/td>\n<td>Traci Evans<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Replace Counter tops in Media Center and Various Classrooms<\/td>\n<td> $40,000.00 <\/td>\n<td>The counter tops are original, they are cracked, bowed and breaking.<\/td>\n<td>Traci Evans<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Add Windows that Open in Classrooms along the South West Side of the building.<\/td>\n<td> $15,000.00 <\/td>\n<td>Because the sun constantly shines on these rooms they become exceedingly hot in the spring and fall. There is no circulation.<\/td>\n<td>Traci Evans<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Add Lane to Main Driveway Entrance into School<\/td>\n<td> $50,000.00 <\/td>\n<td>Main driveway needs another lane continuing problems with traffic.<\/td>\n<td>Traci Evans<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Finish Landscaping around building<\/td>\n<td> $60,000.00 <\/td>\n<td>The natual landscaping around building has overgrown and is very hard to maintain.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Increase Parking on North East Side of School<\/td>\n<td> $100,000.00 <\/td>\n<td>Parking is very limited building new lot will add about 80 parking spaces.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Salter for Bobcat Skid Steer<\/td>\n<td> $5,000.00 <\/td>\n<td>Salter for skid steer will save time<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>EHMS<\/td>\n<td>Replace 2ea. Double Ovens<\/td>\n<td> $60,000.00 <\/td>\n<td>Ovens are 20 years old and are no longer cost-efficient.<\/td>\n<td>Elizabeth Strasser<\/td>\n<\/tr>\n<tr>\n<td>Aquatic Center<\/td>\n<td>Repace All Door Hardware around Pool<\/td>\n<td> $25,000.00 <\/td>\n<td>Over the years chlorine has rusted all door hardware and needs to be replaced<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>Aquatic Center<\/td>\n<td>Rennovation and Remodle of Basement Classroom<\/td>\n<td> $150,000.00 <\/td>\n<td>This room is used for classes, meetings and confernces this room is not safe and dose not meet code.<\/td>\n<td>Todd Klarich<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>Install Carpet over VCT Tile in Hallways<\/td>\n<td> $98,000.00 <\/td>\n<td>Floors are extremley slippery when wet.<\/td>\n<td>Robin Williams<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>poster Printer<\/td>\n<td> $6,000.00 <\/td>\n<td>Needed for teacher projects<\/td>\n<td>Robin Williams<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>New Lunchroom Tables<\/td>\n<td> $35,000.00 <\/td>\n<td>Tables are falling apart and need to be replaced<\/td>\n<td>Robin Williams<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>Need tables and big Rugs for Kindergarten area<\/td>\n<td> $8,000.00 <\/td>\n<td>Need tables and Rugs for Kindergarten area<\/td>\n<td>Robin Williams<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>Install Water Softener on Hot and Cold Domestic Water.<\/td>\n<td> $50,000.00 <\/td>\n<td>Water in Park City Is very Hard and is extermely hard on pipes and all kind of kitchen equipment.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>TSES<\/td>\n<td>Install WaterHog Carpet in all Entryways<\/td>\n<td> $10,000.00 <\/td>\n<td>This will prevent slip and fall accidents<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Projector Updates<\/td>\n<td> $22,500.00 <\/td>\n<td>&nbsp;<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Need Storage Room built for Bobcat Outside of School<\/td>\n<td> $50,000.00 <\/td>\n<td>Currently Bobcat is parked by the Kitchen and exhaust from the Bobcat is going into the cafeteria. This dose not meet fire code.<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Install Windows in the three Kiva Spaces<\/td>\n<td> $15,000.00 <\/td>\n<td>The Kivas are now bing used as offices and classrooms throughout the day.<\/td>\n<td>Shawn Kuennen<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Replace Carpet in Classrooms, Hallways, Media Center.<\/td>\n<td> $162,000.00 <\/td>\n<td>Carpet is reaching the end of their useful life.<\/td>\n<td>Shawn Kuennen<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Provide Emergency Exit Through the Back Fecne  to the Transportation Building.<\/td>\n<td> $10,000.00 <\/td>\n<td>The Transportation Building is where we will relocate our students in the event of an emergency. We need a direct route in case of urgency.<\/td>\n<td>Shawn Kuennen<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Replace Wood Chips in Kindergarten Playground with Rubber Surface<\/td>\n<td> $50,000.00 <\/td>\n<td>Safety and Cleanliness<\/td>\n<td>Shawn Kuennen<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Replace Steamer in Kitchen<\/td>\n<td> $15,000.00 <\/td>\n<td>Steamer is worn out and hard to get parts for.<\/td>\n<td>Elizabeth Strasser<\/td>\n<\/tr>\n<tr>\n<td>JRES<\/td>\n<td>Install Fence Around Perimeter of School<\/td>\n<td> $30,000.00 <\/td>\n<td>There is just open space around school would like to install fence to protect the kids.<\/td>\n<td>Shawn Kuennen<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Replace Classroom Counter Tops and Sinks<\/td>\n<td> $126,000.00 <\/td>\n<td>The Counter tops and sinks are 23 years old and are in pretty rough shape.<\/td>\n<td>Greg Proffit<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Replace Counter Tops ubove lockers in Hallways<\/td>\n<td> $40,000.00 <\/td>\n<td>The Counter tops and sinks are 23 years old and are in pretty rough shape.<\/td>\n<td>Greg Proffit<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Paint Halls, Door Frams and Mulipurpose Room.<\/td>\n<td> $6,500.00 <\/td>\n<td>&nbsp;<\/td>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Need 2ea. Cordless Backpack Vacuums and 2 Extra Batteries<\/td>\n<td> $5,000.00 <\/td>\n<td>This will help us be more productive not pulling around a cord.<\/td>\n<td>Glade Givens<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Add Sidewalk Around Parking Lot<\/td>\n<td> $50,000.00 <\/td>\n<td>Add sidewalk around parking lot for safety<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Install New Doorknobs in School to meet ADA Regulations<\/td>\n<td> $25,000.00 <\/td>\n<td>The round doorknobs do not meet ADA regulations<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>MPES<\/td>\n<td>Need new Dishwasher for School Lunch<\/td>\n<td> $23,000.00 <\/td>\n<td>Dishwasher is worn out and needs to be replaced<\/td>\n<td>Elizabeth Stassser<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Add 30&#215;20 Storage Building on to School<\/td>\n<td> $100,000.00 <\/td>\n<td>They are using the stage and boiler room for storage. Need place to store desks, tables, chairs and other supplies needed for the kids. <\/td>\n<td>Dave Gomez<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Remove Curtain and Build Insulated Wall Between Pre-School Rooms. Add Wall Between Library and Classroom.<\/td>\n<td> $8,000.00 <\/td>\n<td>The curtain does not work as a sound barrier for the two classrooms.<\/td>\n<td>Dave Gomez<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Add Insulated Wall and Door Between Library and Classroom<\/td>\n<td> $5,000.00 <\/td>\n<td>Need additional classroom space.<\/td>\n<td>Dave Gomez<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Replace Carpet in West Side of School<\/td>\n<td> $181,000.00 <\/td>\n<td>The carpet is 15 years old and needs to be replaced<\/td>\n<td>Dave Gomez<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Repair Retaining wall around Kindergarten Play Area.<\/td>\n<td> $450,000.00 <\/td>\n<td>Wall is deteriorating <\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>PPES<\/td>\n<td>Replace Playground Equipment in South Playground<\/td>\n<td> $40,000.00 <\/td>\n<td>Plastic coating on equipment is coming off and causing safety hazard.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>JRES, MPES, PPES,<\/td>\n<td>Replace Remaining Waterless Urinals with Lowflow<\/td>\n<td> $80,000.00 <\/td>\n<td>Waterless Urinals have a noxious oder and filters are very expensive<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>District Office<\/td>\n<td>Replace Carpet Complete<\/td>\n<td> $35,000.00 <\/td>\n<td>Carpet is 16 years old and looks bad.<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District Office<\/td>\n<td>Redesign Parking lot to park more cars<\/td>\n<td> $100,000.00 <\/td>\n<td>will not hold enough cars<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District Office<\/td>\n<td>Repaint areas as needed<\/td>\n<td> $20,000.00 <\/td>\n<td>Paint hallways and stairways<\/td>\n<td>Todd Hansen<\/td>\n<\/tr>\n<tr>\n<td>District Office<\/td>\n<td>Office Update<\/td>\n<td> $15,000.00 <\/td>\n<td>We have a room that was used as a network room that we would like to turn into a couple of offices.<\/td>\n<td>Joe Stout<\/td>\n<\/tr>\n<tr>\n<td>Maintenance<\/td>\n<td>New Maintenance Truck<\/td>\n<td> $50,000.00 <\/td>\n<td>Replace truck 235, Service body, snowplow, salter<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>Maintenance<\/td>\n<td>In bed Salter<\/td>\n<td> $10,000.00 <\/td>\n<td>Salter that will hold a lot of salt will save time and money<\/td>\n<td>Colby Pearce<\/td>\n<\/tr>\n<tr>\n<td>Transportation<\/td>\n<td>2ea. New Schools Buses<\/td>\n<td> $320,000.00 <\/td>\n<td>Replacement Cycle<\/td>\n<td>Todd Hauber<\/td>\n<\/tr>\n<tr>\n<td>Transportation<\/td>\n<td>Remodel Office<\/td>\n<td> $200,000.00 <\/td>\n<td>Improve work place and efficiencies<\/td>\n<td>Todd Hauber<\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>The Park City School Board is considering $57 million in capital outlay requests. Previously&nbsp;we listed the $50 million in requests that were each over&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":""},"categories":[22],"tags":[],"_links":{"self":[{"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/posts\/2754"}],"collection":[{"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/comments?post=2754"}],"version-history":[{"count":0,"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/posts\/2754\/revisions"}],"wp:attachment":[{"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/media?parent=2754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/categories?post=2754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/v2.parkrag.com\/index.php\/wp-json\/wp\/v2\/tags?post=2754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}